Press Nest Africa

Menu
  • Home
  • News
  • Business
  • Political Press
  • Government
  • NGOs
  • BRICS Forum
  • Voices / Opinions

Eskom confirms structural integrity and robust safety monitoring at Koeberg: safety tests have not been skipped

Africa Biz Watch by Africa Biz Watch
September 24, 2025
Eskom synchronises Koeberg Nuclear Power Station Unit 2 with national grid following extensive upgrades
Share on FacebookShare on Twitter

Wednesday, 24 September 2025: Recent commentary suggesting that Eskom is ‘flying blind’ at Koeberg Nuclear Power Station is inaccurate and misleading. Eskom confirms that all safety-critical systems are fully functional, carefully monitored, and continuously improved in line with strict nuclear safety standards.

Containment Structures: Tested, Verified, Monitored and Safe

Koeberg’s containment buildings, the massive concrete domes designed to prevent any release of radiation in the event of an incident, have undergone rigorous structural assessments. These included:

RelatedPosts

Poetry as a Cultural Bridge and an Emotional Bond: the 2025 Classical Chinese Poetry Contest Deepens its Cultural Echoes in Southeast Asia

Travel Smart, Save More. Maximise Your Travel Budget: DBS UnionPay Platinum Debit Card holders can enjoy up to 11% savings on their everyday spending in China

DL Holdings’ Interim Net Profit Surges Over 25-Fold as Digital Finance Strategy Accelerates Implementation

ACES Awards 2025 Day One Celebrates Asia’s Leading Sustainability Champions in Bali

  • Concrete core sampling and mechanical testing, conducted by reputable and independent institutions in line with international nuclear safety standards, confirmed that the material properties remain sound and well within safety margins.
  • The results of the Integrated Leak Rate Test (ILRT) that was recently concluded on Unit 1 further validate the structural integrity of the containment buildings and the data that is being used.
  • The results of various tests and data analyses confirm that both containment structures at Koeberg are fit for continued operation for at least the next 20 years. Monitoring systems such as strain gauges and crack detectors continuously track structural behaviour over time, enabling early detection of any anomalies and supporting proactive, preventative maintenance.
  • The existing containment monitoring instrumentation was fully refurbished and restored during the 2023 and 2024 maintenance cycles. In 2025, Eskom installed Vibrating Wire Strain Gauges (VWSGs) and optical fibre sensors to enhance the precision, redundancy, and reliability of structural monitoring. These upgrades are part of Eskom’s proactive approach to safety—not a response to any immediate risk.

A modification to install new monitoring instruments to enhance monitoring of the containment building is planned for the medium to long term, aimed at continuous improvement and aligned with global best practices.

Safety is Not Optional—It’s Fundamental

Eskom operates Koeberg with a safety-first mindset, under the strict oversight of the National Nuclear Regulator and in full alignment with international nuclear safety conventions. Assertions that safety tests have been skipped or that Eskom is operating “blind” are not only inaccurate—they undermine the rigorous engineering and regulatory processes that govern nuclear operations.

The Integrated Leak Rate Test (ILRT) is a cornerstone of nuclear safety. It pressurises the containment to accident condition pressure to verify that the containment building is leak tight and capable of containing radioactive release in the unlikely event of an accident. The ILRT for Unit 1 was successfully completed during Outage 127 in 2025, and the ILRT for Unit 2 is scheduled for Outage 227, in line with the 10-year testing cycle required by international standards.

The 10-year interval that Eskom has adopted is in line with the standard practice at most nuclear power plants in France. In the United States, the Nuclear Regulatory Commission (NRC) has endorsed a risk-informed methodology that allows licensees to apply for a permanent, performance-based extension of the ILRT surveillance interval from 10 to 15 years. Therefore, the 10-year interval Eskom has adopted aligns with best practices worldwide, and there is currently no performance-based data that requires Eskom to adjust the ILRT interval to every five years.

Koeberg remains one of the most closely monitored and well-maintained nuclear facilities on the continent. Eskom will continue to invest in its safety systems, infrastructure, and personnel to ensure that Koeberg remains a reliable, secure, and compliant source of energy for South Africa.

Eskom assures the public that the containment buildings of both Unit 1 and Unit 2 at Koeberg Nuclear Power Station are safe and fully capable of performing their intended design function.

ENDS


Post Views: 128

Source link

Related Posts

Poetry as a Cultural Bridge and an Emotional Bond: the 2025 Classical Chinese Poetry Contest Deepens its Cultural Echoes in Southeast Asia
Corporate News from Media OutReach Newswire

Poetry as a Cultural Bridge and an Emotional Bond: the 2025 Classical Chinese Poetry Contest Deepens its Cultural Echoes in Southeast Asia

November 29, 2025
Corporate News from Media OutReach Newswire

Travel Smart, Save More. Maximise Your Travel Budget: DBS UnionPay Platinum Debit Card holders can enjoy up to 11% savings on their everyday spending in China

November 29, 2025
DL announces half-year positive profit alert up 20x to HK$220M
Corporate News from Media OutReach Newswire

DL Holdings’ Interim Net Profit Surges Over 25-Fold as Digital Finance Strategy Accelerates Implementation

November 28, 2025
ACES Awards 2025 Day One Celebrates Asia’s Leading Sustainability Champions in Bali
Corporate News from Media OutReach Newswire

ACES Awards 2025 Day One Celebrates Asia’s Leading Sustainability Champions in Bali

November 28, 2025
Corporate News from Media OutReach Newswire

Asian Agri Enhances Community Livelihoods Through Educational and Alternative Income Programmes in Riau

November 28, 2025
Loadshedding remains suspended: R16.69 billion in year-on-year diesel savings achieved – ongoing high levels of planned maintenance continue

The power system remains stable, with unplanned outages reduced by 763MW year-on-year, a steady improvement in EAF, and a continued decline in diesel usage.

November 28, 2025
HONMA Golf Announces Interim Results for FY2025/26 Strong Growth in Korea While Other Markets under Pressure
Corporate News from Media OutReach Newswire

HONMA Golf Announces Interim Results for FY2025/26 Strong Growth in Korea While Other Markets under Pressure

November 28, 2025
Corporate News from Media OutReach Newswire

Lens Technology Donates HK$13.1 Million in Aid Following Devastating Tai Po Fire

November 28, 2025
Next Post
Why Argentina is looking to the Trump administration for a bailout − and what the US Treasury can do to help

Why Argentina is looking to the Trump administration for a bailout − and what the US Treasury can do to help

Dr Katrina Esau honoured for her role in preserving indigenous language

Dr Katrina Esau honoured for her role in preserving indigenous language

Banks retreat from climate change commitments – but it’s business more than politics

Banks retreat from climate change commitments – but it’s business more than politics

Minister Ramokgopa.

Government plans to eliminate load reduction

Personal scandals sink CEOs faster than financial fraud, research shows

Personal scandals sink CEOs faster than financial fraud, research shows

Recommended.

Eskom issues alert of high risk of loadshedding following over ten months of uninterrupted power supply – Summer Outlook remains unchanged.

Eskom issues alert of high risk of loadshedding following over ten months of uninterrupted power supply – Summer Outlook remains unchanged.

January 31, 2025
Vingroup and Gulf States Pursue Sustainability-Led Growth as Legacy Powerhouses Reinvent

Vingroup and Gulf States Pursue Sustainability-Led Growth as Legacy Powerhouses Reinvent

June 6, 2025

Trending.

No Content Available

Publish News, Boost Your PR, SEO, and Business Exposure with SagloMedia's Dedicated Brand Sections

Discover More

News Publications

  • EBNewsDaily
  • South African Business News
  • BetsBulletin SA
  • PressNest
  • EconoNews
  • AfricaBiz Watch

Listing Directories

  • MySouthy
  • BizFinder Directory
  • ListBig
  • SA Companies
  • OutingPlace
  • Rental Kings

Quick Links

  • Home
  • Advertise
  • Publications
  • Company News
  • Privacy Policy
  • Copyright & Takedowns

SagloMedia

  • About us
  • Careers
  • Student Program
  • RSS Feeds
  • Press Code
  • Contact Us

Get In Touch

  • info@saglomedia.co.za
  • Tel: +27 10 880 3950
  • WhatsApp: +27 10 880 3950
  • Johannesburg, South Africa
  • SagloMedia
  • www.saglomedia.co.za
Copyright © 2025 | SagloMedia

Saglohost Web Hosting | Web Hosting South Africa | Web Design Johannesburg | Web Design South Africa | Saglotech | Web Design Company | SEO Company South Africa | SEO Company Johannesburg